Page 12 av 24
Installation and maintenance Manual Digital CAP
Document no. DC10000877
3.1 Procedure before taking the Digital CAP to the cage
Two fastening rails are attached in the back of the connection
box when delivered.
Procedure:
1 Read through this entire proceudre before commencing the
installation process
2 Ensure that both rails are attached to the
back of the battery box (if they are not,
attach them with 3 bolts per rail)
3 Tread the Unistrut nuts in to the rails, one in each side
of each rail
Two Unistrut nuts (blue) placed correctly in a rail
Unistrut nut placed Unistrut nut
correctly in a rail.
Side perspective.
4 Procede to chapter 3.2 for installation in single pole cages, or
to chapter 3.3 for installation in double pole cages.