HYDRAULIC CYLINDER NOT WORKING
- Check level of hydraulic fluid (see sight gauge on tank). Check to
see if pump is functioning properly by attempting to use another cylinder or pressure gauge. If pump is working
properly, check the pressure on the line. The relief valve may be by-passing fluid at too low pressures. If
cylinder is still not functioning properly, check the line for stoppage. The pistons in hydraulic cylinders are
virtually trouble-free, but occasionally one will have a scored wall and allow oil to flow around the piston. In this
case, replace the cylinder.
NOTE
: Refer to repair parts section on valve bank settings on individual relief cartridges.
HYDRAULIC MOTOR NOT WORKING
- Check lines for kinks or pinched place. If the motor is “bogging
down” under load, recheck the relief valve setting on the cutter valve - 2500 P.S.I.
HYDRAULIC VALVE
- Failures in the hydraulic system are almost always caused by other elements in the
system other than the valve; so the entire system should be checked before the valve is changed. A
malfunction In any hydraulic valve section will require replacement of that section (but not the replacement of
the valve bank) since the insides are honed to fit individually. Attachments such as the relief valves and detent
may be serviced individually.
STRUCTURAL MEMBERS
- Failure in structural members generally results from rough treatment. While they
are constructed to withstand abuse, they cannot be made strong enough to withstand abnormal abuse. The
factory does not warrant these parts to any extent other than in normal use in grass, weeds, brush, small
bushes, and small trees which the unit is designed to cut.
Summary of Contents for A-Boom
Page 7: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ...Introduction Section 2 1 2009Alamo Group Inc INTRODUCTION SECTION...
Page 97: ...Operation Section 3 1 2009 Alamo Group Inc OPERATION SECTION...
Page 145: ...Maintenance Section 4 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Page 161: ......