OPERATION
PVB-PVS 08/20
Operation Section 4-2
O
PE
R
AT
IO
N
© 2020 Alamo Group Inc.
BUSH HOG PULVERIZER
OPERATION INSTRUCTIONS
Your Pulverizer should now be assembled and inspected for any evidence of defective or damaged parts
before use. Any evidence of damage should be reported to your dealer immediately. After the Three-Point
Hitch is attached, carefully remove safety blocks from implement.
This section of the Operator’s Manual is designed to familiarize, instruct, and educate safe and proper
implement use to the operator. Pictures contained in this section are intended to be used as a visual aid to
assist in explaining the operation of a pulverizer and are not necessarily of this implement. NEVER OPERATE
this implement without all parts in place and in good operational condition. The operator must be familiar with
the pulverizer and tractor operation and all associated safety practices before operating the pulverizer and
tractor. Proper operation of the pulverizer, as detailed in this manual, will help ensure years of safe and
satisfactory use of the implement.
READ AND UNDERSTAND THE ENTIRE OPERATING INSTRUCTIONS AND SAFETY SECTION OF THIS
MANUAL AND THE TRACTOR MANUAL BEFORE ATTEMPTING TO USE THE TRACTOR AND
IMPLEMENT.
If you do not understand any of the instructions, contact your nearest authorized dealer for a
full explanation. Pay close attention to all safety signs and safety messages contained in this manual and
those affixed to the implement and tractor.
OPS-U- 0001
READ, UNDERSTAND, and FOLLOW the following Safety Messages. Death or serious
injury may occur unless care is taken to follow the warnings and instructions stated in the
Safety Messages. Always use good common sense to avoid hazards.
(SG-2)
Summary of Contents for BUSH HOG PVB
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 16: ...SAFETY PVB PVS 08 20 Safety Section 1 12 SAFETY 2020 Alamo Group Inc Decal Description...
Page 18: ......
Page 19: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 23: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 25: ...Operation Section 4 1 OPERATION SECTION...
Page 46: ......
Page 47: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 49: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 3 MAINTENANCE 2020 Alamo Group Inc...
Page 51: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 5 MAINTENANCE 2020 Alamo Group Inc...
Page 52: ......
Page 54: ...PVB PVS PULVERIZER 08 20 P N 95161 Printed U S A PVB PVS PULVERIZER...