OPERATION
PVB-PVS 08/20
Operation Section 4-5
O
PE
R
AT
IO
N
© 2020 Alamo Group Inc.
3. TRACTOR REQUIREMENTS
Operating the pulverizer with a tractor that does not meet the following requirements may cause tractor or
implement damage and be a potential danger to the operator and passersby.
Tractor Requirements and Capabilities
•
ASABE approved Roll-Over Protective Structure (ROPS) or ROPS cab and seat belt.
•
Tractor Safety Devices ....................Slow Moving Vehicle (SMV) emblem, lighting, PTO master shield
•
Tractor Horsepower (Max.) .............. 60 PTO (all models)
•
Hitch - 3 Point Hitch.......................... CAT I (all models)
•
Front End Weights............................ As need to maintain 20% weight on front axle
3.2 Tractor Horsepower
The power required to operate this implement is determined by the tractor PTO horsepower. For most
operating conditions, the pulverizer require a tractor with the maximum of 60 PTO HP. Operating these
implements with a tractor that does not have adequate power may damage the tractor engine. Exceeding the
recommended horsepower may cause pulverizer damage by overpowering the unit in heavy operating
conditions.
3.1 ROPS and Seat Belt
The tractor must be equipped with a Roll-Over-Protective-Structure (ROPS) (tractor cab or roll-bar) and seat
belt to protect the operator from falling off the tractor, especially during a roll over where the driver could be
crushed and killed. Only operate the tractor with the ROPS in the raised position and seat belt fastened.
Tractor models not equipped with a ROPS and seat belt should have these life saving features installed by an
authorized dealer.
OPS-U- 0003
Operate this Equipment only with a Tractor equipped with an approved roll-
over-protective system (ROPS). Always wear seat belts. Serious injury or even
death could result from falling off the tractor, particularly during a turnover when
the operator could be pinned under the ROPS.
(SG-7)
Summary of Contents for BUSH HOG PVB
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 16: ...SAFETY PVB PVS 08 20 Safety Section 1 12 SAFETY 2020 Alamo Group Inc Decal Description...
Page 18: ......
Page 19: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 23: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 25: ...Operation Section 4 1 OPERATION SECTION...
Page 46: ......
Page 47: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 49: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 3 MAINTENANCE 2020 Alamo Group Inc...
Page 51: ...MAINTENANCE PVB PVS 08 20 Maintenance Section 5 5 MAINTENANCE 2020 Alamo Group Inc...
Page 52: ......
Page 54: ...PVB PVS PULVERIZER 08 20 P N 95161 Printed U S A PVB PVS PULVERIZER...