OPERATION
OPERA
TION
Operation Section 4-15
© 2004 Alamo Group Inc.
SRW1400 10/04
¾
Ensure each implement slip clutch shield is secured
in place and in good condition.
¾
Ensure the driveline slip clutches are properly
adjusted and the friction plates are not frozen
together. Reference the Maintenance Section for
proper slip clutch maintenance.
¾
Inspect the condition of the chain belts.
¾
Ensure the slip clutch shields and chain belt shield
is in place and in good repair.
¾
Ensure the tractor PTO master shield is in place,
lowered and in good condition.
¾
Ensure the drum roller is in good condition and
rotate freely.
¾
Ensure the driveline integral shields are in good
condition and rotate freely.
¾
Inspect that all bolts and screws are in position
and are properly torqued.
¾
Ensure the mower hitch is securely attached to
the tractor drawbar with a proper size pin.
¾
Ensure that a properly rated safety tow chain is
equipped securing the windrower to the tractor.
¾
Check that the main driveline is securely attached
to the tractor and the locking collar is seated in
the groove of the PTO shaft.
¾
Ensure the divider drivelines are secure at both ends
Summary of Contents for Schulte SRW 1400
Page 5: ...SAFETY SECTION Safety Section 1 1 2003 Alamo Group Inc...
Page 16: ...Safety Section 1 12 SRW1400 10 04 SAFETY 2004 Alamo Group Inc SAFETY 35 37 38 36...
Page 24: ......
Page 25: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 28: ......
Page 29: ...2003 Alamo Group Inc ASSEMBLY SECTION...
Page 35: ...OPERATION SECTION 2003 Alamo Group Inc Operation Section 4 1...
Page 70: ......
Page 71: ...2003 Alamo Group Inc MAINTENANCE SECTION...
Page 80: ......