64
1ST BOILERS WITH A CAPACITY OF 1000 KW OR ABOVE:
Boiler
Natural Gas Burner
Diesel
Burner
Fuel Oil Burner
Type
Output
Power
(kW)
21 mbar
300 mbar
Modulating
Flange
Diamet
er
(mm)
Modulating
Flange
Diame
ter
(mm)
Two
Stage
Flange
Diame
ter
(mm)
Two
Stage
Flange
Diame
ter
(mm)
Modulating
Flange
Diame
ter
(mm)
CGS3-1000
1.163
ALG 200/M MBC 1900
256
ALG 200/M-M BC 700
256
240
ALM 125/2
230
ALF 130/2
230
CGS3-1250
1.453
ALG 200/M MBC 3100
256
ALG 200/M-M BC 700
256
240
ALM 174/2
230
ALF 180/2
230
RMS9 VMDU
278
CGS3-1500
1.744
ALM 174/2
230
ALF 180/2
230
RMS9 VMDU
278
CGS3-1750
2.034
L9 VZDU
278
MS9 VZDU
278
RMS9 VMDU
278
CGS3-2000
2.325
L9 VZDU
278
MS9 VZDU
278
RMS9 VMDU
278
CGS3-2500
2.907
L9 VZDU
278
MS10 VZDU
278
RMS10 VMDU
278
CGS3-3000
3.488
L10 VZDU
278
MS10 VZDU
278
RMS10 VMDU
278
Note: The burner to be used must be checked whether it can pass through the burner hole of the boiler, if the hole is small, it should be reported during the order
to request the appropriate hole to be drilled.