43
HARMONY_D USERS INSTALLATION AND SERVICE MANUAL
33
elevation and this operation will only replace the final assembly between the elbow with
flange and the boiler in other installations described in Figs.17, 18 and 20.
Figure 21. Elevation Kit Installation