2. Preparation for Installation
92
2.1 Preparation workflow
The workflow to prepare for installation is shown in
Figure 2-1 Flowchart of the installation
The workflow for supplying power, communication functions and LAN cable installation
should be completed prior to carrying in the components. Make sure to schedule them in
good time.
Figure 2-1
Flowchart of the installation preparation