Provisioning system parameters
Overview
Purpose
This section describes all provisioning tasks which should be performed to prepare the
system for operation and to be able to perform some tests.
Related information
An overview about all 1645 AMC related tasks is given in the “1645 AMC
User Operations Guide”.
Contents
ITM-CIT installation and NE provisioning
Provisioning system parameters
Overview
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
6-14
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
365-313-103R8.0
Issue 2
July 2009