Stand-alone test
procedures
Overview
Purpose
This chapter describes all the tests that should be carried out to check the functionality of
the Es.
Before you begin
Be sure all listed assumptions described below are fulfilled before carrying out any tests:
•
All Es must be mounted and cabled correctly (see Chapters 3 and 4).
•
The battery voltages are connected to the power connector and checked (see chapter
5). An earth connection has been made.
•
The correct software has been installed (see chapter 6).
•
The area address must be available to enter into the DC parameters. This is required
to get the unit out of the (OSI) isolated state.
•
The people carrying out the tests are familiar with 1645 AMC , the SDH functionality,
the ITM-CIT software and the handling of the test equipment.
Additional remarks
The following should also be observed:
•
If the acceptance involves a 1645 AMC E without an option card and without the
DDF cabling, then the test is very limited, as all ports are factory tested.
•
If a DDF is involved the connected cabling needs to be tested for each interface. This
is done by executing the port test on the DDF.
•
If an option card is involved then each port of this card has to be tested on the outlet
of the 1645 AMC or, if applicable, on the DDF, to prove a proper function.
Contents
Test equipment and accessories
Preparation and test of the main unit
E1 tributary ports distribution wiring test
...................................................................................................................................................................................................................................