Part III: Link testing
Overview
Purpose
This part of the 1645 AMC Installation Guide contains the physical network installation
and the recommended link test procedures.
Contents
This part of the document contains the following chapters:
•
Chapter 8:
Link testing
•
Chapter 9:
Conclusion.
Entry checklist
The following provides a checklist to be completed prior to perform the link testing.
Verify that each procedure has been completed. Check off and initial the item.
Procedure
Completed
Initials
Notes
Have all procedures been completed which are
required in Chapter 7,
alone installation test exit checklist” (p. 7-23)
Is the Element Management System OMS
available?
Is the following test equipment available?
•
Optical power meter
•
SDH Analyser
Contents
...................................................................................................................................................................................................................................
365-313-103R8.0
Issue 2
July 2009
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
III-1