Power failure
Overview
The procedures described below should be performed if the 1645 AMC powering
procedure was unsuccessful (see chapter 5, section
“Switching on and testing supply
Procedure 1 should be used if the “Power” LED does not light up on the 1645 AMC unit.
Procedure 2 should be used if the fans in the fan unit are not running.
Procedure 1
Follow the steps below if the “Power” LED does not light up on the 1645 AMC unit:
...................................................................................................................................................................................................
1
Switch the power off.
...................................................................................................................................................................................................
2
Replace all affected power cables between the BDFB (or PDP) and the 1645 AMC unit.
Make sure that the cables are tight afterwards.
...................................................................................................................................................................................................
3
Switch the power on.
IF ...
THEN ...
the “Power” LED does not light up on
the unit,
switch the power off and replace the unit.
the “Power” LED lights up on the unit,
ED OF STEPS
Procedure 2
Follow the steps below if the fans of the fan unit are not running:
...................................................................................................................................................................................................
1
Switch the power off.
...................................................................................................................................................................................................
2
Replace all affected power cables between the BDFB (or PDP) and the fan unit. Make
sure that the cables are tight afterwards.
Installation trouble shooting
Power failure
...................................................................................................................................................................................................................................
...................................................................................................................................................................................................................................
B-2
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
365-313-103R8.0
Issue 2
July 2009
E
N D
O F
S T E P S
...................................................................................................................................................................................................