5
5
Powering
Overview
Purpose
This chapter describes the powering of the 1645 AMC system and some final tests which
should be performed to complete the physical installation tasks.
Assumption
All units/network elements (Es) must be mounted and cabled correctly (see Chapters 3
and 4).
Contents
Switching on and testing supply voltage
Physical and power installation exit checklist
...................................................................................................................................................................................................................................
365-313-103R8.0
Issue 2
July 2009
Alcatel-Lucent – Internal
Proprietary – Use pursuant to Company instruction
5-1