Point-to-point measures list and operating sequence
Tests and Measurements
............................................................................................................................................................................................................................................................
PN 8DG08136CAAA
Issue 1 March 2008
3-59
............................................................................................................................................................................................................................................................
Point-to-point measures list and operating sequence
Description
The aim of point to point measures is to check the whole link including the line.
If alarms and/or errors are detected and if all the local checks have been made, then the
failure is due to external causes. If local checks have not been executed proceed as
instructed in para.3.3 from page 32.
In this section, the following are detailed:
•
Rx optical “line port” power check
•
Optical “line port” link margin
•
Point to point error-monitoring check
Rx Optical “line port” power check
Purpose
•
Verify the optical power of the signal received from the remote 1850 TSS-320 (Station
B on the test bench).
Test instruments [see
Table 3-1, “Instruments” (p. 3-2)
]
•
Craft Terminal (E)
•
Power Meter B)
Summary of Contents for 1850 TSS-320
Page 6: ... List of figures v i PN 8DG08136CAAA Issue 1 March 2008 ...
Page 8: ... List of tables v i i i PN 8DG08136CAAA Issue 1 March 2008 ...
Page 16: ... Safety rules Safety 1 4 PN 8DG08136CAAA Issue 1 March 2008 ...
Page 138: ... Other technical support services Technical Support A 14 PN 8DG08136CAAA Issue 1 March 2008 ...
Page 140: ... Glossary GL 2 PN 8DG08136CAAA Issue 1 March 2008 ...