Installing the SF/CPM
7750 SR-12
Page 85
I
NSTALLING
THE
SF/CPM
Install the SF/CPM module before installing IOMs. Install SF/CPMs only in center slots A or B.
Typically, the first SF/CPM module installed in an SR-12 chassis assumes the role as active,
regardless of being inserted in Slot A or B. The next CPM installed in the same chassis then
assumes the role as the standby CPM.
If only one CPM is installed in the SR-12 router,
it becomes the active CPM regardless of the
slot it is installed in.
When the active CPM is removed for replacement or fails, the standby becomes the active CPM. If
two CPMs are inserted simultaneously (or almost simultaneously) and are booting at the same
time, then preference is given to the CPM installed in Slot A.
NOTE: Each SF/CPM module has two ejector levers which seats and releases the card from the
backplane connectors. During installation, the ejector levers must be positioned inward and then
rotated outward to lock into place. The ejector levers must remain in the locked position while the
card is installed in the chassis.
Summary of Contents for 7750 SR-12
Page 1: ...7750 SR 12 INSTALLATION GUIDE Document Part Number 93 0019 01 December 2003 ...
Page 6: ...Page 4 7750 SR 12 Table of Contents ...
Page 14: ...Page 12 7750 SR 12 ...
Page 84: ...Monitoring AC Power Page 82 7750 SR 12 ...
Page 100: ...Establishing Router Connections Page 98 7750 SR 12 ...
Page 150: ...Impeller Trays Page 148 7750 SR 12 ...