94/314
3CC08991ATAA TQ BJA 01
Issue 01 -- March 2004
Figure 33 - Grounding the “pole mounting” and the cable
Indoor
The installation
of the grounding
kit is necessary
only if D > 80 m
tapped hole
for ground
terminal
tapped hole for
ground terminal
grounding
kit 9400UXI204
D
Figure 34 - Typical example of good earthing practice [ETSI document Draft EG 200 053 V1.4.3
(2002- 02) (Page 91/145), informative]
Lightning finial
bonded to tower
I.F. cable outer conductor bonded to
tower at top and bottom of vertical
run via feeder grounding kit
I.F. cable outer conductor
bonded to earth via feeder
grounding kit
Zone of protection provided by tower
I.F. cable
Earth bar below the hopper
Tower and building earth rings interconnected (driven electrode systems shown)
Independent earthing functions, e.g.
DC power, AC power, etc.
Boundary fence earth via
building earth ring
Each tower leg bonded
via sacrificial earth lug to
tower earth ring
Summary of Contents for 9400 UX
Page 1: ...3CC08991ATAA TQBJA 01 Alcatel 9400 UX User Manual ...
Page 4: ...4 314 3CC08991ATAA TQ BJA 01 Issue 01 March 2004 PAGE INTENTIONALLY LEFT BLANK ...
Page 6: ...6 314 3CC08991ATAA TQ BJA 01 Issue 01 March 2004 PAGE INTENTIONALLY LEFT BLANK ...
Page 14: ...14 314 3CC08991ATAA TQ BJA 01 Issue 01 March 2004 PAGE INTENTIONALLY LEFT BLANK ...
Page 19: ...19 314 3CC08991ATAA TQ BJA 01 Issue 01 March 2004 1 3 5 Eco Declaration ...