Operation
English
3490008529 rev 2012-01
Plate Heat Exchanger
-15
EN
EN
DE
FR
ES
PT
IT
SV
DA
FI
NL
RU
PL
NO
HU
SK
CS
SL
LV
LT
ET
EL
BG
RO
ZH
BG
Unit in operation
Adjustments of flow rates should be made slowly in
order to protect the system against sudden and ex-
treme variations of temperature and pressure.
During operation, check that media temperatures
and pressures are within the limits stated on the
PHE-drawing and identification plate.
Shut-down
1
Slowly close the valve controlling the flow
rate of the pump you are about to stop.
2
When the valve is closed, stop the pump.
3
Repeat steps 1–2 for the other side for the
second media. Continue with both sides of
each section.
4
If the PHE is shut down for several days or
longer, it should be drained. Draining
should also be done if the process is shut
down and the ambient temperature is
below freezing temperature of the media.
Depending on the media processed, it is
also recommended to rinse and dry the
PHE plates and connections.
Note!
If several pumps are included in the system, make sure
you know which one should be stopped first.