4 . 3 STORAGE
In case of long inactivity, the machine must be stored with
cautions concerning storage place and times.
•
Store the machine indoors
•
Protect the machine from jarring impacts and stresses
•
Protect the machine from humidity and high temperatures
•
Avoid corrosive materials that could touch the machine
•
Lubricate the parts which are not painted
4 . 5 UNPACKING
The machine is shipped & packed into an appropriate carton
which is protected with polystyrene sheets.
Remove the external packing and save it for future use.
Check for any casual shipping damage andreport them
immediately.
Shipping damages or any other defects must be reported to
Alfamacchine not later than 3 days from receipt of the
machine.
4 . 4 PRELIMINARY ARRANGEMENTS
To install the machine it is necessary to prepare a working
area adequate to the machine’s dimensions, lifting devices
chosen and length of mouldings to be worked.
4 . 6 PRELIMINARY CONTROLS
The preliminary operations before starting the machine,
must be executed by a technician appointed by the customer.
Before setting up the machine, it is necessary to execute
certain verifications and checks to prevent mistakes or
accidents during setup.
-
Verify the integrity of the box upon receipt of the
machine;
-
Verify the whole content of the box in according to the
parts listed at 4.7.1 before to proceed to the machine
assembly.
4.2
MULTIPLE SHIPPING AND HANDLING
The shipment of more than one machine in the same
time, may be done placing until a max quantity of 12
boxes ( 12 machines) for each single EURO PALLET.
Overall dimensions = (1350x900x1650)mm.