alfasolar GmbH
Ahrensburger Str. 4 6, 30659 Hannover
Geschäftsführer:
Dipl.-Ing. M. Denz (CEO) / Dipl.-Kfm. K.-W. Hoffmann (CFO)
Amtsgericht Hannover HRB 544 55
Gerichtsstand und Sitz: Hannover
Seite 24 von 29
Tel:
Fax:
Mail:
Web:
+49 (0) 511-261 447-0
+49 (0) 511-261 447-50
sales@alfasolar.de
www.alfasolar.de
Revision-Index:
Issued:
Doc.-Nr.
08
2012-12-13
ALE-IEC-01
3.5
Fixing specifications
The permissible design loads depend on the mounting method as indicated below:
3.5.1
Permissible fixing for vertical instruction
Clamping
area
Snow load up to 5400 N/m
2
Wind load up to 2400 N/m
2
Fixing of long
side
3.5.2
Permissible fixing for horizontal installation
Clamp-
ing area
Snow load up to 5400 N/m
2
Wind load up to 2400 N/m
2
Fixing on
long side
3.5.3
Remarks for the fixing
Other mounting system than alfasolar A2 rail system can cause variations to the fixing specifi-
cations which cannot be predicted by alfasolar GmbH. If there occur any questions please con-
tact your contractual partner directly or apply to a certified structural engineer.
This is in subject to technical modifications. The installation instructions are
only valid in combination with datasheets, general terms and conditions and
the current guarantees of alfasolar GmbH for the time being.