5. Align valve stem with pivot screw and repeat the same step with the pin gasket and pivot screw on
the opposite side of the liquid inlet valve.
6. Verify there is no damage to the pin gasket. Set inlet valve assembly aside for an hour to allow
Locktite to properly dry before reinstalling valve assembly back on the vaporizer.
7. Re-install valve in vaporizer with new flange gasket and uniformly torque bolts to 30-35 ft-lbs (40.7-
47.5 Nm).
8. Re-connect sensing line to capacity control valve.
9. After assembly pressurize with 125-150 PSIG (8.6-10.3 bar) compressed air and apply soap solution
or leak detection fluid to both pin gasket areas and to the valve flange area to make sure there are no
leaks.
Summary of Contents for 160H
Page 4: ...This page left intentionally blank...
Page 6: ...This page left intentionally blank...
Page 9: ...This page left intentionally blank...
Page 42: ...Algas SDI Operation and Maintenance Manual P N 54000 5 32 APPENDIX A TECHNICAL INFORMATION...
Page 43: ...Figure 11 160H Vaporizer Replacement Parts 3 11 13 5 6 1 2 7 4 14 10 12 8 9...
Page 57: ......