3.
Operation
Direct Fired Vaporizer start up procedure
3-12
Figure 5 – Temperature control dial in “RUN” position
3
-
12
Figure 6 – Pilot button pressed down and ignitor switch on
3
-
13
Direct Fired Vaporizer setpoint adjustment
3-13
Direct Fired Vaporizer shutdown procedure
3-14
Figure 7 – Vaporizer shut down procedure
3
-
14
Direct fired vaporizer purge procedure
3
-
14
Automatic Re-Ignition Operation
3-15
4.
Maintenance
Maintenance Recommendations
4-16
Table 5 – Initial Installation & Operation Inspections
4
-
16
Table 6 – Annual Maintenance Requirements
4
-
17
Direct fired vaporizer inspection checklist
4-19
Replacing reigniter battery
4-20
Figure 8 – Opening the battery access door
4
-
20
Figure 9 – Replacing the battery
4
-
20
Adjusting burner input pressure
4-21
Figure 10 – Adjusting burner input pressure
4
-
21
Liquid inlet valve maintenance procedure
4-22
Capacity control valve maintenance procedure
4-24
5.
Troubleshooting
Pilot
5-26
Igniter Will Not Spark
5-26
Main Burner Will Not Ignite
5-26
If Vapor Pressure Drops
5-26
Troubleshooting Tree #1: Pilot Will Not Light
5
-
27
Troubleshooting Tree #2: Pilot Lights But Will Not Hold
5
-
28
Troubleshooting Tree #3: Igniter Will Not Spark
5
-
29
Troubleshooting Tree #4: Main Burner Will Not Light
5
-
30
Troubleshooting Tree #5: Vapor Service Pressure Drops
5
-31
Appendix A: Technical Information
Figure 11 – 160H Vaporizer Replacement Parts
Figure 12 – Liquid Inlet Valve and Capacity Control Valve
Table 7 – Repair Kits and Other Available Replacement Parts 160H
Liquid inlet valve pin gasket installation procedure
Thermowell leak test procedure
160H – 800H Equipment Drawings
Summary of Contents for 160H
Page 4: ...This page left intentionally blank...
Page 6: ...This page left intentionally blank...
Page 9: ...This page left intentionally blank...
Page 42: ...Algas SDI Operation and Maintenance Manual P N 54000 5 32 APPENDIX A TECHNICAL INFORMATION...
Page 43: ...Figure 11 160H Vaporizer Replacement Parts 3 11 13 5 6 1 2 7 4 14 10 12 8 9...
Page 57: ......