Aliaro reserve the right to vary from the description given in this data sheet and shall not be liable for any errors.
www.aliaro.com
Customized chassis overview
•
Slot 1: AL-1020 Power Switch Board
•
Slot 2: AL-1020 Power Switch Board
•
Slot 3: AL-2010 Bus Switch Board
Installation requirements
The following knowledge is required to install and run the Power Switch Unit:
•
Basic electrical knowledge
•
Average skills using the Python programming language