ALIMAK 34786 - 1/01
Extra reinforcement of concrete slab
– for hoist with landing equipment on vertical pipe support
The concrete slab must have additional reinforcement in order to
carry the extra load due to the vertical pipes, landing equipment
and the extra load, due to the landings (people, buggies, materials,
etc).
The extra reinforcement is only necessary within the areas shown
in the picture below. The layer of reinforcement should be placed
20 mm (.8 in.) below the upper edge of the slab.
Note that a concrete slab which forms part of a foundation pit
does not require this extra reinforcement.
Cross-section of concrete slab
Extra reinforcement
Normal reinforcement
SCANDO
single car
Face of building
single car
dual cars
220
50
50
50
Ø 10 s 200
(8 3/4’’)
20 mm
(.8 in)
C2
B1
B1
C2
C3
SCANDO
dual cars
C3
1800
Ø 10 s 200
50
(5’- 10 3/4’’)
(2’’)
g 6
g 7
g 8
G
3
Summary of Contents for Scando 650 DOL
Page 4: ......
Page 6: ...2 8 m car base structure 9 2 1 4 3 5 m car base structure 11 5 3 4 ...
Page 16: ...A10 ...
Page 32: ......
Page 38: ...B5 ...
Page 92: ......
Page 94: ......
Page 106: ......
Page 108: ......
Page 116: ...H8 ...
Page 132: ......
Page 134: ......
Page 140: ......
Page 141: ...HOIST capacity 2400 kg or 24 passengers 9101286 101 ...
Page 142: ......
Page 144: ......