21
Pump Maintenance
13
Pump Maintenance
1
3
6
2
5
4
5
3
1
7
6
4
2
8
7
Head Installation
1. Prepare pump head per instructions in PACKING SERVICE.
2. Rotate the plungers so the outer plungers are projecting the same distance from the crankcase.
3. Lubricate the exposed plungers with crankcase oil.
4. Start the head onto the plungers and, using a soft mallet, tap the head evenly until it comes in
contact with the crankcase.
5. Start the cap screws through the head and into the crankcase. Do not forget the lock washer on
each screw.
6. Tighten all cap screws by hand.
7. Torque the cap screws to the value indicated in the TORQUE section of PUMP SPECIFICATIONS.
Torque the cap screws in the order listed below.
Head Installation - Torgue Sequence
Summary of Contents for 5305A
Page 4: ...Month Day Year Operating Hours Maintenance Performed Machine Record...
Page 9: ...5 Trigger Gun Wand 11 Gun Wand Assembly...
Page 14: ...10 Control Panel 31 Coil Outlet Metering Valve Assembly...
Page 17: ...13 Meteing valve Valve Metering...
Page 42: ...38 Burner Burner Exploded View 4 Water Pump...
Page 51: ...47 Tank Assembly...
Page 53: ......
Page 54: ......
Page 55: ......