background image

 

 

MAINTENANCE 

 

  

  

 

 

Quarterly Maintenance Schedule 

             1.  Remove Base Plate and oil Ball Bearing on the underside with food grade lube oil.   
             2.  Remove Can Lifter Handle; oil brass stem and where Handle comes in contact with Frame.  (Use food grade oil) 
             3.  Put food grade white petrolatum on all of the teeth of the Cam Worm Wheel located behind the Cam Worm     
 

    Wheel Cover. 

             4.  Put food grade white petrolatum on the teeth of the Bevel Gear located behind the Front Gear Cover. 
 

Daily Maintenance Schedule:  Use food grade lube oil at each arrow below. 

 

 

 

 

 

Oil Roller 

Oil Hole in CY-2 

Oil Roller 

Oil Hole 

Oil Hole 

Summary of Contents for CROWLER EL-DD

Page 1: ... MANUAL CROWLER CAN SEALER MODEL EL DD WISCONSIN ALUMINUM FOUNDRY CO 1931 SOUTH 14TH STREET MANITOWOC WI 54220 USA 920 682 8627 FAX 920 682 4090 email customerrelations wafco com web page www allamerican1930 com ...

Page 2: ...2 Table of Contents Page 3 Introduction Getting Started Page 4 Maintenance Page 5 Adjustments Seam Gauge Page 6 Trouble Shooting Page 7 Warranty Information ...

Page 3: ...installed in the frame bolt holes or it can be firmly attached to a table or bar using the four bolt holes to bolt down the sealer Use the wooden shipping board as a template to mark and drill holes 3 Connect plug to proper receptacle either 120 or 240 volt depending on your machine 4 Make sure the D22 pins are in the right hole for the can size you are sealing If you are sealing 25 4 oz or 32 oz ...

Page 4: ...omes in contact with Frame Use food grade oil 3 Put food grade white petrolatum on all of the teeth of the Cam Worm Wheel located behind the Cam Worm Wheel Cover 4 Put food grade white petrolatum on the teeth of the Bevel Gear located behind the Front Gear Cover Daily Maintenance Schedule Use food grade lube oil at each arrow below Oil Roller Oil Hole in CY 2 Oil Roller Oil Hole Oil Hole ...

Page 5: ...ront of the machine Run an empty can in the machine to seal the First Operation Remove the can and slip the Gauge over the seam The groove marked 1st should slide over seam on can The seam will not fill the entire length of the groove but the Gauge should slip on far enough so that it touches the can cover If groove in Gauge will not slip over seam tighten 1ST Operation Roller CY 14B by loosening ...

Page 6: ...n liquids can form and lock the roller into place Remove the Roller Bearing Lever and soak assembly in warm soap and water for 10 minutes to loosen buildup Rinse clean and dry Install Roller Bearing Lever adjust and oil with food grade lube oil Can lid is sticking to the chuck after sealing Rollers are adjusted up too high and the metal is being folded over the chuck See page 5 to properly adjust ...

Page 7: ...d defect to WISCONSIN ALUMINUM FOUNDRY CO INC CONSUMER PRODUCTS DIVISION 1931 SOUTH 14th STREET PO BOX 246 MANITOWOC WI 54220 PHONE 920 682 8627 FAX 920 682 4090 Return transportation will be prepaid on all can sealers under warranty Repairs made after the warranty has expired will be billed at the current repair costs We want you to obtain maximum enjoyment from using this quality can sealer and ...

Reviews: