15
PRATIK - Installation use and maintenance ENG- EDITION: 2018-07-05
1.3
LOAD DISTRIBUTION
LOAD DISTRIBUTION
: 3/5 – 2/5 di
Q
Q
= CAPACITY 3000 KG
-
Q1
= 1800KG (3/5 DI Q)
Q2
= 1200KG (2/5 DI Q)
Q2 MAX= 1200KG (2/5 DI Q) Q1 MAX= 1800KG (3/5 DI Q)
Q1 MAX= 1800KG (3/5 DI Q) Q2 MAX= 1200KG (2/5 DI Q)
RECOMMENDED LOADS POSITIONING
POSSIBLE LOADS POSITIONING
Q
2
Q
1
Q
2
Q
1
FIG. 6A
FIG. 6
Summary of Contents for PRATIK 30
Page 2: ...2 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 3: ...3 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 4: ...4 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 37: ...37 PRATIK Installation use and maintenance ENG EDITION 2018 07 05 8 0 HYDRAULIC SCHEME...
Page 38: ...38 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 42: ...42 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 44: ...44 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 53: ...53 PRATIK Installation use and maintenance ENG EDITION 2018 07 05 TAV 3 CONTROL UNIT...