Operating Instructions - cont’d
Pitch Adjustment
Different pitch angles are needed as you work the different stages of the concrete. Refer to
fi
gure be-
low. When changing or setting pitch (angle of trowel blades), slow the machine down, set the desired
degree of pitch on the left side of the machine and then adjust the right side to match.
To increase the pitch, turn the pitch control clockwise “a” use the pitch indicator “b” to adjust pitch
equally on both right and left trowel blades.
Summary of Contents for MSP470A
Page 1: ...OPERATIONS PARTS MANUAL 053257 01 2014 Riding Trowel...
Page 14: ...053257 01 2014 Page xii Dimensional Speci cations...
Page 16: ...053257 01 2014 INTENTIONALLY BLANK Page xiv...
Page 17: ...053257 01 2014 SECTION 1 SAFETY Page 1 1 Section 1 SAFETY...
Page 18: ...053257 01 2014 SECTION 1 SAFETY Page 1 2 State Regulations Proposition 65 Warning...
Page 19: ...053257 01 2014 SECTION 1 SAFETY Page 1 3 Federal Regulations Respiratory Hazards...
Page 33: ...053257 01 2014 SECTION 2 OPERATIONS Page 2 1 Section 2 OPERATIONS...
Page 41: ...053257 01 2014 SECTION 3 SERVICE Page 3 1 Section 3 SERVICE...
Page 53: ...053257 01 2014 SECTION 3 SERVICE Page 3 13...
Page 59: ...053257 01 2014 SECTION 4 PARTS Page 4 1 Section 4 PARTS...
Page 104: ...053257 01 2014 SECTION 4 PARTS Page 4 46 Electrical Schematic Illustration...
Page 105: ...053257 01 2014 SECTION 4 PARTS Page 4 47 Electrical Schematic Illustration...
Page 106: ...053257 01 2014 SECTION 4 PARTS Page 4 48 Hydraulic Schematic Illustration...
Page 119: ...053257 01 2014 INTENTIONALLY BLANK...