5. SQUARING TRUSS
- After the machine has been placed on
the deck, center the paving carriage in the truss. All four corners
of the machine must be set to the same height to assure that the
truss does not have a twist. Measure the distance between the
carriage rail and the top of the screed rail or paving form. Adjust
the distance using the machine leg cranks until all four corners
are equal.
6. DRAG PAN INSTALLATION
- Attach the drag pan hanger
frame to the upper carriage of the paving carriage and assemble
the drag pan. Adjust the pitch of the mounting tube so that it
hangs straight. Use the drag pan crank and adjust the “H” Frame
of the drag pan so that it is 5” to 7” above the bottom of the paving
rollers. Hook the loose end of the drag pan chain into the fifth link.
Screws (A) are used ONLY when the carriage is positioned for a
skewed deck. Tighten these screws when it is necessary to lock
the drag pan tube (C) when the carriage does not pivot. Carriage
bolts (B) serve as stops for the drag-pan tube during normal oper-
ation. Pivot the carriage and hold the tube parallel to the centerline
of the deck. Adjust the bolt so that it holds the tube parallel as
it travels across the deck. Repeat procedure with the carriage
pivoted in the opposite direction. Tighten jam nuts to hold bolts.
7. AUGER INSTALLATION
- Slide the augers onto the lower car-
riage auger shafts. Facing the lower carriage, slide the clockwise
auger onto the right hand shaft and the counter clockwise auger
onto the left hand shaft. Tighten auger hardware and mount the
auger guard assembly. Turn the auger adjusting crank and set the
augers 1/8” to 1/4” above the bottom of the paving rollers. NOTE:
Grease the auger shafts.
8. STRAIGHTEN THE MACHINE
- After all attachments have
been installed on the paving carriage it is time to align and
straighten the machine frame. Maximize machine weight by filling
the gas and hydraulic tanks. Be sure that the paving carriage
has been moved to the center of the machine. There are many
ways of straightening the truss. You can pull a string line under
the truss or simply use line of sight. Raise or lower the machine
truss by adjusting the crown bolts at all of the hinge points until
the truss appears straight to the naked eye. If your machine is
equipped with a manual crown adjuster, both sides of the truss
can be adjusted on either side by turning the nut on the lower side
of the truss frame.
9. STRAIGHTEN CARRIAGE RAIL
- Next, you should string line
the carriage rail. Use 120# masonry line and tie a string line to the
eye bolt on the idler frame end of the machine.
Crown Bolt Assembly
SECTION 2
OPERATIONS
050362
Page 33
2.5 - Machine Setup, continued
Summary of Contents for BDF4836B
Page 5: ...050362 Page 5 Table of Contents continued ...
Page 14: ...050362 Page 14 Notes ...
Page 15: ...SECTION 1 SAFETY 050362 Page 15 SECTION 1 SAFETY ...
Page 21: ...SECTION 1 SAFETY 050362 Page 21 PAGE LEFT BLANK INTENTIONALLY ...
Page 22: ...Notes SECTION 1 SAFETY 050362 Page 22 ...
Page 23: ...SECTION 2 OPERATIONS 050362 Page 23 SECTION 2 OPERATIONS ...
Page 40: ...Power Crown Lever Nut A SECTION 2 OPERATIONS 050362 Page 40 2 6 Power Crown Option ...
Page 46: ...Skew Clamp Skew Cylinder SECTION 2 OPERATIONS 050362 Page 46 2 7 Paving Operations continued ...
Page 49: ...SECTION 2 OPERATIONS 050362 Page 49 PAGE LEFT BLANK INTENTIONALLY ...
Page 50: ...SECTION 2 OPERATIONS 050362 Page 50 Notes ...
Page 51: ...SECTION 3 SERVICE 050362 Page 51 SECTION 3 SERVICE ...