WARNING! Do Not Use Piano Wire. It could
result in serious injury
Run the string line along the carriage rail to the eye bolt on the
drive frame end of the machine. Pull and tighten the string line
by hand until it is taut with no sag. If necessary turn the eye bolts
for additional tension. Loosen the carriage rail adjuster locknut on
the outside of the truss no more than 1/2 turn. Cut three identical
2” x 6” wood blocks. Place one at each end of the carriage rail to
push the string line up so that it will clear the top of the carriage
rail (See Figure 17). Set the third wood block on the carriage rail
at each carriage rail adjuster. Turn the carriage rail adjuster up or
down so that the string line just touches the top of the wood block.
After the carriage rail has been adjusted and is straight, re-tighten
all of the carriage rail locknut. Repeat the procedure on the oppo-
site side of the machine.
10. SQUARE CARRIAGE
- Before squaring the paving carriage,
make sure that the lower carriage slide blocks make contact
with the upper carriage skew ring.
If your machine is equipped
with a carriage lift option, make sure that it is in the down
position.
If contact is not made, turn the pivot nut located on
the underside of the lower carriage. If contact is uneven, check
for wear on the slide blocks. It may be necessary to replace
the blocks or block shims. Start the paving carriage engine and
engage the on/off lever. To pivot the lower carriage, manually
push or pull the reversing valve shift rod to engage the pivot
cylinder. Adjust the turntable pivot nut until lower carriage pivots
freely. When you are satisfied that it does, shut off the engine
and replace the cotter pin in the pivot nut.
SECTION 2
OPERATIONS
050362
Page 34
2.5 - Machine Setup, continued
Summary of Contents for BDF4836B
Page 5: ...050362 Page 5 Table of Contents continued ...
Page 14: ...050362 Page 14 Notes ...
Page 15: ...SECTION 1 SAFETY 050362 Page 15 SECTION 1 SAFETY ...
Page 21: ...SECTION 1 SAFETY 050362 Page 21 PAGE LEFT BLANK INTENTIONALLY ...
Page 22: ...Notes SECTION 1 SAFETY 050362 Page 22 ...
Page 23: ...SECTION 2 OPERATIONS 050362 Page 23 SECTION 2 OPERATIONS ...
Page 40: ...Power Crown Lever Nut A SECTION 2 OPERATIONS 050362 Page 40 2 6 Power Crown Option ...
Page 46: ...Skew Clamp Skew Cylinder SECTION 2 OPERATIONS 050362 Page 46 2 7 Paving Operations continued ...
Page 49: ...SECTION 2 OPERATIONS 050362 Page 49 PAGE LEFT BLANK INTENTIONALLY ...
Page 50: ...SECTION 2 OPERATIONS 050362 Page 50 Notes ...
Page 51: ...SECTION 3 SERVICE 050362 Page 51 SECTION 3 SERVICE ...