064355 - 06/2015
Page 35
SECTION 2
OPERATIONS
Pitch Adjustment
Different pitch angles are needed as you work the different stages of the concrete. Refer to figure be
-
low. When changing or setting pitch (angle of trowel blades), slow the machine down, set the desired
degree of pitch on the left side of the machine and then adjust the right side to match.
To increase the pitch, turn the pitch control clockwise “a” use the pitch indicator “b” to adjust pitch equal
-
ly on both right and left trowel blades.
Operating Instructions - cont’d
Summary of Contents for HP105
Page 1: ...OPERATIONS PARTS MANUAL Riding Trowel ...
Page 15: ...064355 06 2015 Page 15 CE Documentation ...
Page 16: ...064355 06 2015 Page 16 SECTION 1 SAFETY State Regulations Proposition 65 Warning ...
Page 17: ...064355 06 2015 Page 17 SECTION 1 SAFETY Federal Regulations Respiratory Hazards ...
Page 91: ...064355 06 2015 Page 91 SECTION 4 PARTS Notes ...