2-9
053383; 11/10
SECTION 2
OPERATIONS
2.3, continued
Operating Instructions
2.3.4 Pitch
Adjustment
Different pitch angles are needed as you work the different stages of the concrete.
Refer to Figure 2.3.4 table below. When changing or setting pitch (angle of trowel
blades), slow the machine down, set the desired degree of pitch on the left side of the
machine and then adjust the right side to match.
To increase the pitch, turn the pitch control clockwise “
a
” use the pitch indicator “
b
” to
adjust pitch equally on both right and left trowel blades.
FIGURE 2.3.4
Pitch Adjustment
Summary of Contents for MP215
Page 1: ...OPERATIONS PARTS MANUAL MP235 RIDING TROWEL REVISION 05 2018 MANUAL PART 053383 ...
Page 18: ...xvi 053383 11 10 ...
Page 19: ...1 1 053383 11 10 SECTION 1 SAFETY Section 1 SAFETY ...
Page 32: ...1 14 SECTION 1 SAFETY 053383 11 10 INTENTIONALLY LEFT BLANK ...
Page 33: ...2 1 053383 11 10 SECTION 2 OPERATIONS Section 2 OPERATIONS ...
Page 43: ...3 1 053383 11 10 SECTION 3 SERVICE Section 3 SERVICE ...
Page 62: ...3 20 SECTION 3 SERVICE 053383 11 10 Notes ...
Page 63: ...Section 4 PARTS ...
Page 80: ...053383 07 2017 4 18 SECTION 4 PARTS 4 8 Electrical Schematic ...
Page 81: ...053383 07 2017 4 19 SECTION 4 PARTS 4 8 Electrical Schematic cont d ...
Page 96: ...053383 07 2017 4 34 SECTION 4 PARTS 4 16 Illustration Accessory Non standard Items 2 1 ...
Page 98: ...053383 07 2017 4 36 SECTION 4 PARTS 4 17 Illustration Tools Service 1 2 ...
Page 101: ...053383 07 2017 4 39 SECTION 4 PARTS Notes ...
Page 102: ...053383 11 10 INTENTIONALLY BLANK ...