SECTION 1
SAFETY
075765
Page 24
Lifting Safety
OSHA has set forth guidelines which detail the use of Rigging Equipment for Material
handling. This guideline is found under
OSHA Standard Number: 1926.251
Please read and follow all guidelines found in this standard.
Removal from service.
Synthetic web slings shall
be immediately removed
from service if any of the
following conditions are
present:
OSHA 1926.251(e)(8)
ALWAYS do a thorough inspection of the slings, chains, and hooks before attempting
to lift the machine!
Summary of Contents for MP235
Page 13: ...075765 Page 13 General Information Machine Dimensions 86 7 37 7 55 6 ...
Page 15: ...075765 Page 15 General Information CE Declaration PENDING CE DECLARATION AT THIS TIME ...
Page 17: ...SECTION 1 SAFETY 075765 Page 17 SECTION 1 SAFETY ...
Page 30: ...SECTION 2 OPERATIONS 075765 Page 30 SECTION 2 OPERATION ...
Page 38: ...SECTION 3 SERVICE 075765 Page 38 SECTION 3 SERVICE ...