PG 12
Chimney Section below, and align it for the offset. Refer to
Table 2
to determine
the required offset length and attach an appropriate length (or lengths) of
Chimney Section(s) above the Elbow. Note: maximum of two chimney sections
can be connected between Elbows. The maximum length of chimney pipe
between elbows is not to exceed 72”. Attach the second Elbow above the
Chimney Section to complete the offset (Fig 12).
2.
Secure Offset:
Place the Elbow Strap’s band around the angled portion of the
top Elbow, then tighten the nut and bolt until the clamp is firm. Wrap the Elbow
Strap end over an adjacent joist or rafter and secure it with at least (2) 8-penny
nails or (2) #8, 1-½” screws. Do not add more Chimney Sections until the
Elbows are supported. Be sure that the chimney remains vertical. If there is
more than one Chimney Section between the Elbows, install a second Elbow
Strap around the joint of the two Chimney Sections (Fig 12).
AllFuel HST Inc
Toll Free: (833) 326-8368