801805
105
Section 5 Service Procedures
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect all electric power to the machine and accessories before servicing.
• Close gas shut-off valve to gas dryer before servicing.
• Never start machine with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the machine is properly grounded.
• Washer motor not grounded! Disconnect electric power before servicing motor.
W502
WARNING
b. Power Cord:
(1) Remove access plate on rear of cabinet.
(2) Remove strain relief.
(3) Remove screw holding power cord ground
wire to rear bulkhead. Refer to Figure 57.
NOTE: Reinstall screw and ground wires into same
hole in bulkhead when reinstalling power cord.
(4) Disconnect molex plug and remove power
cord from rear of dryer cabinet.
NOTE: A qualified electrician should check the
polarity of the wall receptacle. If a voltage reading
is measured other than that illustrated, the qualified
electrician should correct the problem.
Figure 57
D354SE3A
Ground
L1
Neutral
Side
Dryer
Power Cord
115±12
V.A.C.
115±12
V.A.C.
0
V.A.C.
Ground
Wires
120 Volt, 60 Hertz Shown