51
Maintenance
F232058
Weekly Preventive Maintenance Checklist
Machine ____________________________
Operator ___________________________
Month __________
Week Ending:
Checks
/
/
/
/
/
Observe All Safety Warnings!
1. Check the machine for leaks:
a. Start an unloaded cycle to fill the machine.
b. Verify that door and door gasket do not leak.
c. Verify that the drain valve is operating.
2.
3.
4.
5.
6.
7.
Summary of Contents for UF35PV
Page 2: ......
Page 24: ...Installation 22 F232058 Figure 12 B147IE3A Rear Panel Four 4 Transport Brackets Front Panel...
Page 56: ...54 NOTES F232058 Maintenance...
Page 60: ......
Page 70: ...68 NOTAS F232058 SP Seguridad...
Page 117: ...115 Mantenimiento F232058 SP...