Make sure the compressed air is on and the regulator is at 75 psi.
2
Load the tubing into the funnel.
3
Push the tubing all the way through the funnel until you feel it stop. It should have
stopped against the feed wheel. Hold the band tubing in place keeping some
pressure against the feed wheel.
4
Press the "FEED" button on the the control panel until you feel the feed wheel
engage and apply pressure, pulling the tubing. Make sure to not press "FEED" more
than 1-2 times after you feel it pull the tubing.
5
If it does not engage and pull the tube after a few attempts, see step 7a. If it
engages, continue to step 8.
IMPORTANT!
2020.09
Page 8
Summary of Contents for Oyster Banding Machine
Page 2: ......
Page 21: ...2020 09 Page 18 ...
Page 23: ...2020 09 Page 20 ...
Page 25: ...2020 09 Page 22 ...
Page 27: ...2020 09 Page 24 ...
Page 29: ...2020 09 Page 26 ...
Page 31: ...2020 09 Page 28 ...
Page 33: ...2020 09 Page 30 ...