45-008 REV. 1/22
20
2. Purge the system by installing a jumper line and operating each
hydraulic function (clamp, rotate and side shift, if equipped)
in each direction for a minimum of 30 seconds. (Figure 4-7)
Hoses should meet or exceed SAE100 RI Type AT, with maximum working pressure
of 3,000 psi for all attachment functions.
To Truck
To Clamp
Figure 4-7, Jumper line setup
3. Install the hoses from the truck to the attachment. For specific hydraulic sche-
matics, please see your serial number-specific parts manual, available online in
the Manuals and Publications tab at
www.alliedsystems.com.
Clamp
Open
Gauge Post
Figure 4-8, Hose connections