x530 Series Installation Guide for Stand-alone Switches
89
Figure 41. Switch Initialization Messages (Continued)
After the switch has initialized its management software, go to Chapter 7,
“Configuring the Switch for Stand-alone Operations” on page 91.
Initializing HA processes:
atmf_agentd, execd, exfx, hostd, atmfd, auth, epsr
hsl, imi, imiproxyd, lldpd, loopprot, mstp, nsm
pim6d, ripngd, rmon, sflowd, vrrpd, bgpd, irdpd
lacp, ospf6d, ospfd, pdmd, pimd, ripd, udldd
Received event network.initialized
Assigning Active Workload to HA processes:
hsl, irdpd, lacpd, loopprotd, mstpd, nsm, ospfd
ripd, rmond, sflowd, vrrpd, authd, epsrd, imi
imiproxyd, lldpd
Received event network.activated
Loading default configuration
..
done!
Received event network.configured
Summary of Contents for AlliedWare Plus AT-x530 Series
Page 10: ...Tables 10...
Page 14: ...Preface 14...
Page 58: ...Chapter 3 Installing the Switch on a Table 58...
Page 90: ...Chapter 6 Powering On the Switch 90...