AT-SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
189
Figure 121. Lifting the Locking Handle and Removing the Power Supply
12. Do one of the following:
To install a new power supply, refer to “Installing AT-
SBxPWRSYS2 AC Power Supplies” on page 87 or “Installing AT-
SBxPWRSYS1-80 DC Power Supplies” on page 91.
If you are not installing a new power supply, continue with this
procedure to install the blank power supply slot cover.
13. Place the locking handle on the blank power supply slot cover in the up
position and slide the cover into the empty power supply slot. Refer to
Figure 122 on page 190.
Summary of Contents for AT-FAN08
Page 10: ...Figures 10...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 38: ...Chapter 1 Overview 38...
Page 60: ...Chapter 2 Virtual Chassis Stacking 60...
Page 82: ...Chapter 4 Installing the Chassis 82 Figure 34 Example of Adjusting the Equipment Rack Brackets...
Page 104: ...Chapter 4 Installing the Chassis 104...
Page 140: ...Chapter 5 Powering On the Chassis 140...
Page 166: ...Chapter 7 Cabling the AT XEM2 Line Card Ports 166...