AT-SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
79
Adjusting the Equipment Rack Brackets
The chassis comes with two pre-installed equipment rack brackets. The
default positions of the brackets align the front of the chassis with the front
of the equipment rack. You can re-position the brackets on the sides of the
chassis to have the device extend in front of the rack. Figure 31 here and
Figure 32 on page 80 and Figure 33 on page 81 show the various bracket
and chassis orientations. The first illustration in Figure 31 shows the
default positions of the brackets.
Figure 31. Chassis Orientations in the Equipment Rack
Summary of Contents for AT-FAN08
Page 10: ...Figures 10...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 38: ...Chapter 1 Overview 38...
Page 60: ...Chapter 2 Virtual Chassis Stacking 60...
Page 82: ...Chapter 4 Installing the Chassis 82 Figure 34 Example of Adjusting the Equipment Rack Brackets...
Page 104: ...Chapter 4 Installing the Chassis 104...
Page 140: ...Chapter 5 Powering On the Chassis 140...
Page 166: ...Chapter 7 Cabling the AT XEM2 Line Card Ports 166...