AT-GS900/8PS Switch Installation Guide
35
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
Summary of Contents for AT-GS900/8PS
Page 1: ...PN 613 001687 Rev A AT GS900 8PS Gigabit Ethernet POE Switch AT GS900 8PS Installation Guide...
Page 8: ...Figures 8...
Page 10: ...Tables 10...
Page 14: ...Preface 14...
Page 52: ...Chapter 3 Troubleshooting 52...