AT-x230L-17GT and AT-x230L-26GT Switch Installation Guide
31
Unpacking the switch: AT-x230L-26GT
To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipped package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the shipped package includes the following items:
1 Power cable hook
AT-x230L-26GT
4 x Rubber feet
M3 x 4.5 screws for
rubber feet x 4
Rack Mount Kit
1 Power cable (1.8m)
1 Console cable (2m)
2 x Brackets
6 x Screws
x230L
-26G
T
Summary of Contents for AT-x230L-17GT
Page 8: ...vi ...
Page 10: ...viii ...
Page 60: ...Chapter 2 Installation 50 ...
Page 64: ...Chapter 3 Troubleshooting 54 ...