Chapter 6: Powering On the Switch
104
Figure 58. Saving the Changes with the WRITE Command
9. Enter the REBOOT command to reboot the switch.
10. At the confirmation prompt, type “Y” for yes.
11. Wait for the switch to initialize its management software and
afterwards examine the Switch ID LED. If the ID number is “0,” the
switch is ready for normal network operations as a stand-alone unit.
Refer to the
Software Reference for x310 Series Switches, AlliedWare
Plus Operating System,
for instructions on how to configure the
operating parameters. If the number is not “0,” repeat this procedure.
awplus# write
Building configuration ...
[OK]
awplus#
Summary of Contents for AT-x310-26FP
Page 10: ...Tables 10 ...
Page 14: ...Preface 14 ...
Page 46: ...Chapter 1 Overview 46 ...
Page 56: ...Chapter 2 Beginning the Installation 56 ...
Page 92: ...Chapter 5 Cabling the Networking Ports 92 ...