GS970EMX/10 Gigabit Ethernet Switch Installation Guide
81
4. Remove the dust cover from the transceiver, as shown in Figure 44.
Figure 44. Removing the Dust Cover from an SFP+ Transceiver
5. Verify the position of the handle on the transceiver. The handle should
be in the upright position, as shown in Figure 45.
Figure 45. Positioning the SFP+ Handle in the Upright Position
6. Connect the fiber optic cable to the transceiver, as shown in Figure 46
on page 82. The connector on the cable should fit snugly into the port,
and the tab should lock the connector into place.
SFP+ Handle
Summary of Contents for GS970EMX/10
Page 1: ...613 003019 Rev A GS970EMX 10 Gigabit Layer 3 Ethernet Switch Installation Guide...
Page 6: ...6...
Page 10: ...Figures 10...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 36: ...Chapter 1 Overview 36...
Page 48: ...Chapter 2 Beginning the Installation 48...
Page 88: ...Chapter 7 Troubleshooting 88...