x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide
77
Unpacking a Switch
To unpack a switch, perform the following procedure:
1. Remove all components from the shipping packages.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. For a non-PoE switch, make sure the following components are
included in your switch package. If any item is missing or damaged,
contact your Allied Telesis sales representative for assistance.
One non-PoE x610 Series Layer 3 Gigabit Ethernet Switch
Two rack-mount brackets
Twelve flathead Phillips rack-mount bracket screws
Four regional AC power cords (Americas, Australia, EU, Japan,
and UK only)
One AC power cord retaining clip
One management cable for local management
4. For a PoE switch, make sure the following components are included in
your switch package. If any item is missing or damaged, contact your
Allied Telesis sales representative for assistance.
One PoE x610 Series Layer 3 Gigabit Ethernet Switch
Two rack-mount brackets
Twelve flathead Phillips rack-mount bracket screws
One management cable for local management