Chapter 4: Beginning the Installation
104
Choosing a Site for the Chassis
Observe these site requirements.
If you are installing the device in an equipment rack, check that the
rack is safely secured so that it will not tip over. Devices should be
installed in the rack starting at the bottom, with the heavier devices
near the bottom of the rack.
The power outlet should be located near the chassis and be easily
accessible.
The site should allow for easy access to the ports on the front of
the switch, so that you can easily connect and disconnect cables,
and view the port LEDs.
The site should allow for adequate air flow around the unit and
through the cooling vents on the front and rear panels. (The
ventilation direction is from front to back, with the fans on the back
panel drawing the air out of the unit.)
The site should not expose the switch to moisture or water.
The site should be a dust-free environment.
The site should include dedicated power circuits or power
conditioners to supply reliable electrical power to the network
devices.
Twisted pair cabling should not be exposed to sources of electrical
noise, such as radio transmitters, broadband amplifiers, power
lines, electric motors, or fluorescent fixtures.
Switch ports are suitable for intra-building connections, or where
non-exposed cabling is required.
Do not install the device in a wiring or utility box that has
inadequate airflow because it might overheat and fail.
Summary of Contents for x950 Series
Page 12: ...Figures 12 ...
Page 18: ...Preface 18 ...
Page 50: ...Chapter 1 Overview 50 ...
Page 70: ...Chapter 2 XEM2 Ethernet Line Cards 70 ...
Page 134: ...Chapter 5 Installing Power Supplies and Optional XEM2 Line Card 134 ...
Page 146: ...Chapter 7 Installing the Switch in an Equipment Rack 146 ...
Page 162: ...Chapter 8 Installing the Switch on a Wall 162 ...
Page 224: ...Chapter 12 Powering On and Verifying the Stack 224 ...
Page 256: ...Chapter 14 Replacing Modules 256 ...