x950 Series Installation Guide for VCStack
113
Figure 53. Removing the Power Supply from the Shipping Box
4. Remove the power supply from the shipping end-caps and protective
shipping bag. Refer to Figure 54.
Figure 54. Removing the Power Supply from the Shipping End-caps and
Protective Bag
5. Visually inspect the product for damage.
6. After unpacking the switch and power supplies, go to Chapter 5,
“Installing Power Supplies and Optional XEM2 Line Card” on page
115.
Summary of Contents for x950 Series
Page 12: ...Figures 12 ...
Page 18: ...Preface 18 ...
Page 50: ...Chapter 1 Overview 50 ...
Page 70: ...Chapter 2 XEM2 Ethernet Line Cards 70 ...
Page 134: ...Chapter 5 Installing Power Supplies and Optional XEM2 Line Card 134 ...
Page 146: ...Chapter 7 Installing the Switch in an Equipment Rack 146 ...
Page 162: ...Chapter 8 Installing the Switch on a Wall 162 ...
Page 224: ...Chapter 12 Powering On and Verifying the Stack 224 ...
Page 256: ...Chapter 14 Replacing Modules 256 ...