5. Do one of the following:
To install power supplies, go to “Installing PWR600 AC Power
To install an optional XEM2 Ethernet Line Card, go to “Installing an
Optional XEM2 Ethernet Line Card” on page 130.
After installing both switches of the stack, go to Chapter 10,