x950 Series Installation Guide for VCStack
195
5. If the switch has two DC power supplies, repeat this procedure to
power on the second DC power supply.
6. If you have the PWR600 AC power supply installed on the switch, go
to “Powering on the PWR600 AC Power Supply” on page 192.
7. Wait two minutes for the switch to initialize its management software.
Summary of Contents for x950 Series
Page 12: ...Figures 12 ...
Page 18: ...Preface 18 ...
Page 50: ...Chapter 1 Overview 50 ...
Page 70: ...Chapter 2 XEM2 Ethernet Line Cards 70 ...
Page 134: ...Chapter 5 Installing Power Supplies and Optional XEM2 Line Card 134 ...
Page 146: ...Chapter 7 Installing the Switch in an Equipment Rack 146 ...
Page 162: ...Chapter 8 Installing the Switch on a Wall 162 ...
Page 224: ...Chapter 12 Powering On and Verifying the Stack 224 ...
Page 256: ...Chapter 14 Replacing Modules 256 ...