x950 Series Installation Guide for VCStack
245
4. Press the release lever to the right and pull on the handle to release
the power supply from the internal connector in the switch. Refer to
Figure 144. Removing the Power Supply
5. Carefully slide the power supply from the switch. Refer to Figure 145
Warning
The power supply is heavy. Use both hands to hold it when
removing it from the switch.
Release Lever
Summary of Contents for x950 Series
Page 12: ...Figures 12 ...
Page 18: ...Preface 18 ...
Page 50: ...Chapter 1 Overview 50 ...
Page 70: ...Chapter 2 XEM2 Ethernet Line Cards 70 ...
Page 134: ...Chapter 5 Installing Power Supplies and Optional XEM2 Line Card 134 ...
Page 146: ...Chapter 7 Installing the Switch in an Equipment Rack 146 ...
Page 162: ...Chapter 8 Installing the Switch on a Wall 162 ...
Page 224: ...Chapter 12 Powering On and Verifying the Stack 224 ...
Page 256: ...Chapter 14 Replacing Modules 256 ...